Project Completion Certificate (Ground Water)
Scheme ID: 20059022 Name of Scheme: JARELI JJM No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 5930 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 02-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30M/114M JARELI 27.586992 80.264390
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 74.4M³/45M JARELI 27.586992 80.264390
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 375KL/16M JARELI 27.586992 80.264390
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 4.511
2 HDPE PIPE PN:-6 75 2.733
3 HDPE PIPE PN:-6 90 2.943
4 HDPE PIPE PN:-6 110 1.504
5 HDPE PIPE PN:-6 125 0.855
6 HDPE PIPE PN:-6 140 0.00
7 HDPE PIPE PN:-6 160 0.755
8 HDPE PIPE PN:-6 180 0.295
9 HDPE PIPE PN:-6 200 0.860
HSC Connection
Sno. Total Nos.
1 1150
Other Details
3.44
0.00
3.71
01-Aug-2025
23-Sep-2025