Project Completion Certificate (Ground Water)
Scheme ID: 20059048 Name of Scheme: BARAI KALA & SIWAR WSS No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 4690 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 19-Mar-2024 Actual Date of Completion (Capex): 14-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.00/106.80 BARAIKALA 26.776957 81.80891
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 926LPM/40Mtr BARAIKALA 26.776957 81.80891
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275/14 BARAIKALA 26.776923 80.80881
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 125 0.0156
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.4114
2 HDPE Pipe PN-6: Class PE-100 180 0.6240
3 HDPE Pipe PN-6: Class PE-100 160 0.4296
4 HDPE Pipe PN-6: Class PE-100 140 0.7050
5 HDPE Pipe PN-6: Class PE-100 125 0.0000
6 HDPE Pipe PN-6: Class PE-100 110 0.5224
7 HDPE Pipe PN-6: Class PE-100 90 0.2061
8 HDPE Pipe PN-6: Class PE-100 75 0.5083
9 HDPE Pipe PN-6: Class PE-100 63 11.0777
HSC Connection
Sno. Total Nos.
1 855
Other Details
3.67
0.00
4.38
14-Jan-2025
01-Feb-2025