Project Completion Certificate (Ground Water)
Scheme ID: 20059058 Name of Scheme: BHUSEHRA (GOGP) JJM No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 4640 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Sep-2024 Actual Date of Completion (Capex): 31-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30M/267M BHUSEHRA 27.32194 79.79048
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 58.2M³/47M BHUSEHRA 27.32194 79.79048
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300KL/18M BHUSEHRA 27.32194 79.79048
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 2.594
2 HDPE PIPE PN:-6 75 2.127
3 HDPE PIPE PN:-6 90 1.645
4 HDPE PIPE PN:-6 110 0.692
5 HDPE PIPE PN:-6 125 0.856
6 HDPE PIPE PN:-6 140 1.791
7 HDPE PIPE PN:-6 160 1.118
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 3.656
HSC Connection
Sno. Total Nos.
1 750
Other Details
3.28
0.00
3.65
30-Jun-2025
23-Sep-2025