Project Completion Certificate (Ground Water)
Scheme ID: 20059074 Name of Scheme: MANIPUR (GOGP) JJM No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 4360 Base Year: 2023 Intermediate Year: 2039 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 06-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27M/109M MANIPUR 27.545478 80.2567
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 54.6M³/45M MANIPUR 27.545478 80.2567
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275KL/16M MANIPUR 27.545478 80.2567
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.036
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 4.399
2 HDPE PIPE PN:-6 75 2.232
3 HDPE PIPE PN:-6 90 1.853
4 HDPE PIPE PN:-6 110 3.181
5 HDPE PIPE PN:-6 125 0.361
6 HDPE PIPE PN:-6 140 0.515
7 HDPE PIPE PN:-6 160 3.674
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.197
HSC Connection
Sno. Total Nos.
1 878
Other Details
3.50
0.00
3.49
05-Aug-2025
30-Sep-2025