| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20059132 | Name of Scheme: KTHETHA (GOGP) JJM | No. of Villages: 5 | No. of Habitation Covered: 10 |
| Total Population Covered: 4940 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Aug-2024 | Actual Date of Completion (Capex): 15-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 34M/280M | KTHETHA | 27.311875 | 79.794797 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 62.4M³/41M | KTHETHA | 27.311875 | 79.794797 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 300KL/12M | KTHETHA | 27.311875 | 79.794797 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 200 | 0.021 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN:-6 | 63 | 5.546 | |
| 2 | HDPE PIPE PN:-6 | 75 | 4.74 | |
| 3 | HDPE PIPE PN:-6 | 90 | 4.929 | |
| 4 | HDPE PIPE PN:-6 | 110 | 1.468 | |
| 5 | HDPE PIPE PN:-6 | 125 | 0.596 | |
| 6 | HDPE PIPE PN:-6 | 140 | 1.141 | |
| 7 | HDPE PIPE PN:-6 | 160 | 2.513 | |
| 8 | HDPE PIPE PN:-6 | 180 | 0.00 | |
| 9 | HDPE PIPE PN:-6 | 200 | 0.017 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |