Project Completion Certificate (Ground Water)
Scheme ID: 20059256 Name of Scheme: SALAVA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2639 Base Year: 2023 Intermediate Year: 2038 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 24-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 SUBMERSIBLE 30.04/125.41 SALAVA 29.222267 78.471258
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 600/50 SALAVA 29.222267 78.471258
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/12 SALAVA 29.222267 78.471258
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.1126
2 HDPE 75 3.258
3 HDPE 90 0.12227
4 HDPE 110 1.1502
5 HDPE 125 0.073
6 HDPE 140 0.031
7 HDPE 160 0.148
HSC Connection
Sno. Total Nos.
1 435
Other Details
2.19
0.00
2.24
25-Sep-2024
24-Dec-2024