| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20059256 | Name of Scheme: SALAVA WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2639 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2052 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 24-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 30.04/125.41 | SALAVA | 29.222267 | 78.471258 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible | 600/50 | SALAVA | 29.222267 | 78.471258 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175/12 | SALAVA | 29.222267 | 78.471258 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 1.1126 | |
| 2 | HDPE | 75 | 3.258 | |
| 3 | HDPE | 90 | 0.12227 | |
| 4 | HDPE | 110 | 1.1502 | |
| 5 | HDPE | 125 | 0.073 | |
| 6 | HDPE | 140 | 0.031 | |
| 7 | HDPE | 160 | 0.148 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 435 |