Project Completion Certificate (Ground Water)
Scheme ID: 20059385 Name of Scheme: SALARPUR Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2230 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 27-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 18.03/124.79 Salarpur 26.621227 82.546859
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 10 HP 27/45 Salarpur 26.621227 82.546859
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 125/14 Salarpur 26.621263 82.54675
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 .014
2 DI-K7 150 .026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 4.3476
2 HDPE Pipe PN-6: Class PE-100 75 .8264
3 HDPE Pipe PN-6: Class PE-100 90 .6806
4 HDPE Pipe PN-6: Class PE-100 110 .2123
5 HDPE Pipe PN-6: Class PE-100 140 1.769
6 HDPE Pipe PN-6: Class PE-100 160 .1803
HSC Connection
Sno. Total Nos.
1 269
Other Details
1.84
1.84
1.83
27-Feb-2025
28-Feb-2025