| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20059385 | Name of Scheme: SALARPUR Water Supply Scheme | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 2230 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Dec-2023 | Actual Date of Completion (Capex): 27-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of Tubewell Assembly | 18.03/124.79 | Salarpur | 26.621227 | 82.546859 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Ac Submersible Pump 10 HP | 27/45 | Salarpur | 26.621227 | 82.546859 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 125/14 | Salarpur | 26.621263 | 82.54675 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 100 | .014 | |
| 2 | DI-K7 | 150 | .026 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 4.3476 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | .8264 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | .6806 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | .2123 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 140 | 1.769 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 160 | .1803 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 269 |