Project Completion Certificate (Ground Water)
Scheme ID: 20059408 Name of Scheme: SADDARPUR Water Supply Scheme No. of Villages: 5 No. of Habitation Covered: 7
Total Population Covered: 3810 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 25-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell 30.07/119.63 Saddarpur 26.510073 82.60521
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 15 hp 0.8/46 Saddarpur 26.512234 82.60521
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Rcc 225/16 Saddarpur 26.512234 82.60521
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.644
2 HDPE Pipe PN-6: Class PE-100 75 1.390
3 HDPE Pipe PN-6: Class PE-100 63 10.671
4 HDPE Pipe PN-6: Class PE-100 110 0.184
5 HDPE Pipe PN-6: Class PE-100 125 0.045
6 HDPE Pipe PN-6: Class PE-100 140 0.748
7 HDPE Pipe PN-6: Class PE-100 160 0.0098
8 HDPE Pipe PN-6: Class PE-100 180 0.613
9 HDPE Pipe PN-6: Class PE-100 200 0.552
HSC Connection
Sno. Total Nos.
1 590
Other Details
3.06
3.06
3.04
25-Oct-2025
26-Oct-2025