| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20059419 | Name of Scheme: ARSAWAN Water Supply Scheme | No. of Villages: 5 | No. of Habitation Covered: 7 |
| Total Population Covered: 3770 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Dec-2023 | Actual Date of Completion (Capex): 30-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering Of Tubewell Assembly | 30/79.34 | ARSAWAN | 26.534764 | 82.585417 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Ac Submersible Pump 15 hp | 0.8/46 | arsawan | 26.534764 | 82.585417 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Rcc | 225/16 | Arsawan | 26.534764 | 82.585417 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 200 | 15 | |
| 2 | DI-K7 | 150 | 29 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 90 | 1.852 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 1.015 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 63 | 11.445 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.258 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.839 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 160 | 0.857 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 180 | 0.407 | |
| 8 | HDPE Pipe PN-6: Class PE-100 | 200 | 0.655 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 630 |