Project Completion Certificate (Ground Water)
Scheme ID: 20059419 Name of Scheme: ARSAWAN Water Supply Scheme No. of Villages: 5 No. of Habitation Covered: 7
Total Population Covered: 3770 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 30-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering Of Tubewell Assembly 30/79.34 ARSAWAN 26.534764 82.585417
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 15 hp 0.8/46 arsawan 26.534764 82.585417
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Rcc 225/16 Arsawan 26.534764 82.585417
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 200 15
2 DI-K7 150 29
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.852
2 HDPE Pipe PN-6: Class PE-100 75 1.015
3 HDPE Pipe PN-6: Class PE-100 63 11.445
4 HDPE Pipe PN-6: Class PE-100 110 0.258
5 HDPE Pipe PN-6: Class PE-100 140 0.839
6 HDPE Pipe PN-6: Class PE-100 160 0.857
7 HDPE Pipe PN-6: Class PE-100 180 0.407
8 HDPE Pipe PN-6: Class PE-100 200 0.655
HSC Connection
Sno. Total Nos.
1 630
Other Details
3.01
3.01
2.98
29-Jul-2025
30-Jul-2025