Project Completion Certificate (Ground Water)
Scheme ID: 20059636 Name of Scheme: DEORIYA & MUZAR VILLAGE WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3900 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 27-Jan-2023 Actual Date of Completion (Capex): 29-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200x150 24.04m/240.96m DEORIYA & MUZAR 25.660784 82.449219
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP 770LPM/47m DEORIYA & MUZAR 25.660784 82.449219
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL/16M DEORIYA & MUZAR 25.660801 82.449179
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.017 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.376 Yes
2 HDPE 75 3.560 Yes
3 HDPE 63 12.841 Yes
4 HDPE 110 0.796 Yes
5 HDPE 140 1.619 Yes
6 HDPE 160 0.229 Yes
7 HDPE 180 0.090 Yes
HSC Connection
Sno. Total Nos.
1 625
Other Details
3.09
3.09
2.47
29-Oct-2025
30-Oct-2025