Project Completion Certificate (Ground Water)
Scheme ID: 20059652 Name of Scheme: AMIRTA MARKERA (GOGP) JJM No. of Villages: 3 No. of Habitation Covered: 11
Total Population Covered: 4960 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Aug-2024 Actual Date of Completion (Capex): 29-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24M/125M AMIRTA MARKERA 27.483725 79.787457
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 63M³/45M AMIRTA MARKERA 27.483725 79.787457
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300KL/16M AMIRTA MARKERA 27.483725 79.787457
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.047
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 8.807
2 HDPE PIPE PN:-6 75 9.325
3 HDPE PIPE PN:-6 90 3.656
4 HDPE PIPE PN:-6 110 2.684
5 HDPE PIPE PN:-6 125 1.525
6 HDPE PIPE PN:-6 140 2.010
7 HDPE PIPE PN:-6 160 0.544
8 HDPE PIPE PN:-6 180 0.43
9 HDPE PIPE PN:-6 200 0.431
HSC Connection
Sno. Total Nos.
1 1120
Other Details
4.51
0.00
4.49
28-Jun-2025
26-Sep-2025