Project Completion Certificate (Ground Water)
Scheme ID: 20059718 Name of Scheme: SURJIPUR (GOGP) No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 6720 Base Year: 2023 Intermediate Year: 2039 Design Year: 2053
Date of Completion (As per Contract): 26-Aug-2024 Actual Date of Completion (Capex): 23-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 28M/124M SURJIPUR 27.529461 79.980094
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 84.6M³/45M SURJIPUR 27.529461 79.980094
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 425KL/16M SURJIPUR 27.529461 79.980094
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.033
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 75 3.791
2 HDPE PIPE PN:-6 90 2.336
3 HDPE PIPE PN:-6 110 1.937
4 HDPE PIPE PN:-6 125 0.00
5 HDPE PIPE PN:-6 140 0.114
6 HDPE PIPE PN:-6 160 0.924
7 HDPE PIPE PN:-6 180 0.383
8 HDPE PIPE PN:-6 200 1.488
9 HDPE PIPE PN:-6 63 7.529
HSC Connection
Sno. Total Nos.
1 1455
Other Details
4.13
0.00
4.22
22-Jun-2025
23-Sep-2025