Project Completion Certificate (Ground Water)
Scheme ID: 20059934 Name of Scheme: GHASO (GOGP) JJM No. of Villages: 6 No. of Habitation Covered: 9
Total Population Covered: 6370 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Nov-2024 Actual Date of Completion (Capex): 26-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30M / 107M GHASO 27.677563 79.720109
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 79.8M³/47M GHASO 27.677563 79.720109
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 400KL / 18M GHASO 27.677563 79.720109
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.033
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 7.038
2 HDPE PIPE PN:-6 75 10.061
3 HDPE PIPE PN:-6 90 1.684
4 HDPE PIPE PN:-6 110 2.259
5 HDPE PIPE PN:-6 125 2.807
6 HDPE PIPE PN:-6 140 2.064
7 HDPE PIPE PN:-6 160 3.753
8 HDPE PIPE PN:-6 180 0.353
9 HDPE PIPE PN:-6 200 2.698
HSC Connection
Sno. Total Nos.
1 1460
Other Details
5.38
0.00
6.06
25-Jul-2025
25-Sep-2025