Project Completion Certificate (Ground Water)
Scheme ID: 20060036 Name of Scheme: SULTANPUR WSS No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2900 Base Year: 2023 Intermediate Year: 2038 Design Year: 2052
Date of Completion (As per Contract): 17-Jan-2024 Actual Date of Completion (Capex): 19-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of tubewell assembly 24.06/57.78 SULTANPUR 26.510655 82.539055
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 ACsubmersible pumping 12.5HP 600 LPM /12.5 SULTANPUR 26.510655 82.539055
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 150/14 SULTANPUR 26.481612 82.5606
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 .028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.576
2 HDPE Pipe PN-6: Class PE-100 63 6.470
3 HDPE Pipe PN-6: Class PE-100 75 1.739
4 HDPE Pipe PN-6: Class PE-100 110 0.412
5 HDPE Pipe PN-6: Class PE-100 140 2.360
6 HDPE Pipe PN-6: Class PE-100 160 0.074
HSC Connection
Sno. Total Nos.
1 440
Other Details
2.09
2.19
2.00
19-Mar-2025
20-Mar-2025