| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20060069 | Name of Scheme: CHANDANPARA WSS | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 4393 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 18-Jan-2024 | Actual Date of Completion (Capex): 04-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of tubewell assembly | 30.07/99.25 | CHANDANPARA | 26.353353 | 82.563355 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | ACsubmersible pumping 17.5HP | 950LPM /44 | CHANDANPARA | 26.357855 | 82.563353 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 250/14 | CHANDANPARA | 26.357860 | 82.563365 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 150 | 0.032 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Pipe PN-6: Class PE-100 | 90 | 0.538 | |
| 2 | Pipe PN-6: Class PE-100 | 75 | 0.861 | |
| 3 | Pipe PN-6: Class PE-100 | 63 | 4.139 | |
| 4 | Pipe PN-6: Class PE-100 | 110 | 0.623 | |
| 5 | Pipe PN-6: Class PE-100 | 140 | 0.956 | |
| 6 | Pipe PN-6: Class PE-100 | 160 | 0.083 | |
| 7 | Pipe PN-6: Class PE-100 | 200 | 0.195 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 242 |