Project Completion Certificate (Ground Water)
Scheme ID: 20060161 Name of Scheme: Pondari WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 7326 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Aug-2024 Actual Date of Completion (Capex): 05-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 43.09 M / 83.66 M PONDARI 28.3952603 77.9467984
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE 1380 LPM / 52 M PONDARI 28.3952603 77.9467984
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 400 KL / 20 M PONDARI 28.3952603 77.9467984
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0425
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 19.740
2 HDPE 75 0.774
3 HDPE 90 3.228
4 HDPE 110 1.160
5 HDPE 125 0.177
6 HDPE 140 0.391
7 HDPE 180 2.101
8 HDPE 200 0.106
HSC Connection
Sno. Total Nos.
1 1424
Other Details
4.19
4.09
4.27
05-Jul-2025
06-Jul-2025