Project Completion Certificate (Ground Water)
Scheme ID: 20060189 Name of Scheme: Bhatpura WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2080 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Aug-2024 Actual Date of Completion (Capex): 25-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.05 / 70.55 BHATPURA 28.471221 77.718621
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE 410 LPM / 44 M BHATPURA 28.471221 77.718621
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT- 1 125 KL / 12 M BHATPURA 28.471221 77.718517
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0135
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.117
2 HDPE 75 0.58
3 HDPE 90 0.913
4 HDPE 110 0.211
5 HDPE 140 0.234
HSC Connection
Sno. Total Nos.
1 565
Other Details
1.54
1.53
1.57
15-Jun-2025
16-Jun-2025