Project Completion Certificate (Ground Water)
Scheme ID: 20060348 Name of Scheme: SALARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 3630 Base Year: 2023 Intermediate Year: 2035 Design Year: 2053
Date of Completion (As per Contract): 27-Jan-2024 Actual Date of Completion (Capex): 15-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200X150 30M/230.9 M SALARPUR 25.574048 82.628349
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP 760 LPM/43M SALARPUR 25.574048 82.628349
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 KL /12 M SALARPUR 25.574051 82.628292
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 150 0.0165 YES
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.680 YES
2 HDPE 75 4.197 YES
3 HDPE 63 8.559 YES
4 HDPE 110 1.589 YES
5 HDPE 140 0.650 YES
6 HDPE 160 0.527 YES
7 HDPE 200 0.101 YES
HSC Connection
Sno. Total Nos.
1 632
Other Details
3.03
3.03
2.70
15-May-2026
16-May-2026