Project Completion Certificate (Ground Water)
Scheme ID: 20060414 Name of Scheme: SAIDAPUR(GOGP) JJM No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3900 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 19-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18M/89M SAIDAPUR 27.50021 79.75489
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 49.8M³/43M SAIDAPUR 27.50021 79.75489
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250KL/14M SAIDAPUR 27.50021 79.75489
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 3.350
2 HDPE PIPE PN:-6 75 2.131
3 HDPE PIPE PN:-6 90 1.676
4 HDPE PIPE PN:-6 110 0.331
5 HDPE PIPE PN:-6 125 0.120
6 HDPE PIPE PN:-6 140 3.115
7 HDPE PIPE PN:-6 160 0.439
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.022
HSC Connection
Sno. Total Nos.
1 713
Other Details
2.65
0.00
3.24
18-Jul-2025
26-Sep-2025