| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20061456 | Name of Scheme: SADHIYA WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 2671 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 14-Oct-2024 | Actual Date of Completion (Capex): 27-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | MS PIPE 300MM AND 150MM | 81.8M/35M | SADHIYA | 26.523745 | 81.529404 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible pump | 600 LPM/ 52M | SADHIYA | 26.523745 | 81.529404 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150KL/14M | SADHIYA | 26.523745 | 81.529404 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | 0.015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE 63MM TO 160 MM | 160 | 12.452 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 638 |