Project Completion Certificate (Ground Water)
Scheme ID: 20061471 Name of Scheme: RAMPUR PANWARA & RATWALIA MANJHAR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 16
Total Population Covered: 6307 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Dec-2024 Actual Date of Completion (Capex): 22-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150 MM PLAIN PIPE 28.80 RAMPUR PANWARA 26.469905 81.39602
2 200 MM PLAIN PIPE 51.50 RAMPUR PANWARA 26.469905 81.39602
3 300 MM PLAIN PIPE 54.00 RAMPUR PANWARA 26.469905 81.39602
4 150 MM SLOTTED PIPE 18.00 RAMPUR PANWARA 26.469905 81.39602
5 200 MM SLOTTED PIPE 18.00 RAMPUR PANWARA 26.469905 81.39602
6 300 MM SLOTTED PIPE 12.00 RAMPUR PANWARA 26.469905 81.39602
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 525 LPM / 56 M RAMPUR PANWARA 26.469905 81.39602
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 KL / 18 M RAMPUR PANWARA 26.469905 81.39602
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.781
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.227
2 HDPE PIPE 75 2.051
3 HDPE PIPE 63 14.774
4 HDPE PIPE 110 1.451
5 HDPE PIPE 125 1.754
6 HDPE PIPE 160 1.477
7 HDPE PIPE 180 1.930
8 HDPE PIPE 200 1.080
HSC Connection
Sno. Total Nos.
1 885
Other Details
5.48
0.00
5.48
24-Aug-2024
10-Dec-2024