Project Completion Certificate (Ground Water)
Scheme ID: 20061550 Name of Scheme: GADAULI WSS No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 3060 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Feb-2024 Actual Date of Completion (Capex): 05-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.00
2 HDPE 180 0.662
3 HDPE 160 0.418
4 HDPE 140 0.515
5 HDPE 125 0.165
6 HDPE 110 0.596
7 HDPE 90 1.223
8 HDPE 75 0.891
HSC Connection
Sno. Total Nos.
Other Details
2.78
0.00
3.35
05-Jun-2024
15-Dec-2024