Project Completion Certificate (Ground Water)
Scheme ID: 20061571 Name of Scheme: KHEWLI & PUHLI WSS No. of Villages: 4 No. of Habitation Covered: 12
Total Population Covered: 4070 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Feb-2024 Actual Date of Completion (Capex): 22-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/104.8 PHUPHI & KHEWLI 26.628162 82.110113
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 850/40 PHUPHI & KHEWLI 26.628162 82.110113
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/14 PHUPHI & KHEWLI 26.628162 82.110113
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.014
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6:CLASS PE-100 200 0.061
2 HDPE PIPE PN-6:CLASS PE-100 180 .858
3 HDPE PIPE PN-6:CLASS PE-100 160 0.00
4 HDPE PIPE PN-6:CLASS PE-100 140 0.050
5 HDPE PIPE PN-6:CLASS PE-100 125 0.334
6 HDPE PIPE PN-6:CLASS PE-100 110 0.617
7 HDPE PIPE PN-6:CLASS PE-100 90 2.544
8 HDPE PIPE PN-6:CLASS PE-100 75 2.122
9 HDPE PIPE PN-6:CLASS PE-100 63 15.678
HSC Connection
Sno. Total Nos.
1 876
Other Details
3.22
0.00
3.87
23-Oct-2024
17-Jun-2025