Project Completion Certificate (Ground Water)
Scheme ID: 20061583 Name of Scheme: SALARPUR WSS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2260 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Feb-2024 Actual Date of Completion (Capex): 04-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/110.8 SALARPUR 26.748703 82.036421
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 470/40 SALARPUR 26.748703 82.036421
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/12 SALARPUR 26.748703 82.036421
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.0325
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6:CLASS PE-100 200 0
2 HDPE PIPE PN-6:CLASS PE-100 180 0
3 HDPE PIPE PN-6:CLASS PE-100 160 0.7362
4 HDPE PIPE PN-6:CLASS PE-100 140 0.131
5 HDPE PIPE PN-6:CLASS PE-100 125 0
6 HDPE PIPE PN-6:CLASS PE-100 110 0.197
7 HDPE PIPE PN-6:CLASS PE-100 90 .5964
8 HDPE PIPE PN-6:CLASS PE-100 75 0.7659
9 HDPE PIPE PN-6:CLASS PE-100 63 4.2954
HSC Connection
Sno. Total Nos.
1 464
Other Details
1.87
0.00
2.62
04-Jul-2024
03-Feb-2025