Project Completion Certificate (Ground Water)
Scheme ID: 20061625 Name of Scheme: SONWARSA MAFI W/S No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 6400 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Feb-2024 Actual Date of Completion (Capex): 05-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30/100.8 SONWARSA MAFI 26.625221 82.091607
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 1330/40 SONWARSA MAFI 26.625221 82.091607
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 375/14 SONWARSA MAFI 26.625221 82.091607
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6:CLASS PE-100 200 0.032
2 HDPE PIPE PN-6:CLASS PE-100 180 0.2435
3 HDPE PIPE PN-6:CLASS PE-100 160 1.698
4 HDPE PIPE PN-6:CLASS PE-100 140 1.097
5 HDPE PIPE PN-6:CLASS PE-100 125 0.736
6 HDPE PIPE PN-6:CLASS PE-100 110 0.803
7 HDPE PIPE PN-6:CLASS PE-100 90 0.834
8 HDPE PIPE PN-6:CLASS PE-100 75 1.128
9 HDPE PIPE PN-6:CLASS PE-100 63 4.868
HSC Connection
Sno. Total Nos.
1 1348
Other Details
3.02
0.00
3.63
05-Feb-2025
06-May-2025