Project Completion Certificate (Ground Water)
Scheme ID: 20062430 Name of Scheme: ATAGANJ USARI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2534 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Aug-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 16(m) / 57.5(m) Ataganj Usari 26.028065 81.49206
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 600(M³) / 45(Mtr.) Ataganj Usari 26.028065 81.49206
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 175 (KL) / 16(Mtr.) Ataganj Usari 26.028065 81.49206
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 150 0.020
2 DI-K9 100 0.006
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.580
2 HDPE 75 1.391
3 HDPE 90 1.248
4 HDPE 125 0.187
5 HDPE 160 0.200
6 HDPE 200 0.076
HSC Connection
Sno. Total Nos.
1 370
Other Details
2.01
0.00
2.20
27-May-2025
10-Jun-2025