Project Completion Certificate (Ground Water)
Scheme ID: 20062637 Name of Scheme: HAZIPUR MARUAI Water supply scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2220 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Jan-2023 Actual Date of Completion (Capex): 14-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of tubewell assembly 18./110.29 HAZIPUR MARUAI 26.46282606 82.58497133
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 ACsubmersible pumping 10HP 450LPM /44 HAZIPUR MARUAI 26.46282618 82.58497140
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 125/14 HAZIPUR MARUAI 26.4628262 82.5849714
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Pipe PN-6: Class PE-100 90 1.324
2 Pipe PN-6: Class PE-100 75 0.864
3 Pipe PN-6: Class PE-100 63 7.031
4 Pipe PN-6: Class PE-100 110 0.285
5 Pipe PN-6: Class PE-100 140 0.040
HSC Connection
Sno. Total Nos.
1 267
Other Details
1.72
1.97
1.97
14-Nov-2025
15-Nov-2025