| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20062637 | Name of Scheme: HAZIPUR MARUAI Water supply scheme | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2220 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 17-Jan-2023 | Actual Date of Completion (Capex): 14-Nov-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of tubewell assembly | 18./110.29 | HAZIPUR MARUAI | 26.46282606 | 82.58497133 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | ACsubmersible pumping 10HP | 450LPM /44 | HAZIPUR MARUAI | 26.46282618 | 82.58497140 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 125/14 | HAZIPUR MARUAI | 26.4628262 | 82.5849714 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 125 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Pipe PN-6: Class PE-100 | 90 | 1.324 | |
| 2 | Pipe PN-6: Class PE-100 | 75 | 0.864 | |
| 3 | Pipe PN-6: Class PE-100 | 63 | 7.031 | |
| 4 | Pipe PN-6: Class PE-100 | 110 | 0.285 | |
| 5 | Pipe PN-6: Class PE-100 | 140 | 0.040 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 267 |