Project Completion Certificate (Ground Water)
Scheme ID: 20062909 Name of Scheme: KANCHANPUR JJM SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2658 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 05-Jan-2024 Actual Date of Completion (Capex): 13-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/124.8 KANCHANPUR 28.084185 80.643728
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 550/40 KANCHANPUR 28.083917 80.64355
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/14 KANCHANPUR 28.083232 80.645658
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.0193
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 75 0.285
2 HDPE 63 3.358
3 HDPE 110 1.466
4 HDPE 140 3.034
5 HDPE Pipe 160 0.055
HSC Connection
Sno. Total Nos.
1 288
Other Details
1.98
0.00
1.97
12-May-2024
13-May-2024