Project Completion Certificate (Ground Water)
Scheme ID: 20063806 Name of Scheme: Bhevan No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 4240 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Jan-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 20/49.2 Bhevan 26.596405 79.992661
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 81.5/61 Bhevan 26.596405 79.992661
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/20 Bhevan 26.596405 79.992661
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.023
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 11.5
2 HDPE 75 1.9730
3 HDPE 90 1.645
4 HDPE 110 0.548
5 HDPE 125 2.508
6 HDPE 140 2.177
7 HDPE 160 0.643
8 HDPE 200 0.036
HSC Connection
Sno. Total Nos.
1 650
Other Details
1.59
1.99
1.99
12-Sep-2023
13-Sep-2023