| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20064688 | Name of Scheme: HAJIPATTI GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 7 |
| Total Population Covered: 7170 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 12-Jan-2024 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 51.19M/165.58M | Hajipatti | 26.288175 | 81.89533 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump-1 & 2 | 740 LPM/ 50 M | Hajipatti | 26.288175 | 81.89533 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 450 KL/ 16 M | Hajipatti | 26.288175 | 81.89533 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/ K7 | 125 | 0.4682 | |
| 2 | DI/ K7 | 200 | 1.225 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/ PN-6: Class PE-100 | 63 | 17.806 | |
| 2 | HDPE/ PN-6: Class PE-100 | 75 | 1.23 | |
| 3 | HDPE/ PN-6: Class PE-100 | 90 | 1.737 | |
| 4 | HDPE/ PN-6: Class PE-100 | 110 | 3.91 | |
| 5 | HDPE/ PN-6: Class PE-100 | 125 | 1.494 | |
| 6 | HDPE/ PN-6: Class PE-100 | 140 | 0.337 | |
| 7 | HDPE/ PN-6: Class PE-100 | 160 | 1.335 | |
| 8 | HDPE/ PN-6: Class PE-100 | 180 | 0 | |
| 9 | HDPE/ PN-6: Class PE-100 | 200 | 0.38 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1483 |