Project Completion Certificate (Ground Water)
Scheme ID: 20064704 Name of Scheme: KACHANAYA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2600 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jan-2024 Actual Date of Completion (Capex): 12-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.15/ 118.96 Kachanaya 26.262538 81.956149
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 550lpm/ 45M Kachanaya 26.262538 81.956149
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150kl/ 12M Kachanaya 26.262538 81.956149
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/ K7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/ PN-6: CLASS PE-100 63 8.26
2 HDPE/ PN-6: CLASS PE-100 75 1.918
3 HDPE/ PN-6: CLASS PE-100 90 1.529
4 HDPE/ PN-6: CLASS PE-100 110 0.666
5 HDPE/ PN-6: CLASS PE-100 125 0.108
6 HDPE/ PN-6: CLASS PE-100 140 0.047
7 HDPE/ PN-6: CLASS PE-100 160 0
8 HDPE/ PN-6: CLASS PE-100 180 0.026
9 HDPE/ PN-6: CLASS PE-100 200 0
HSC Connection
Sno. Total Nos.
1 578
Other Details
2.31
0.00
2.36
11-Oct-2024
01-Dec-2024