Project Completion Certificate (Ground Water)
Scheme ID: 20064718 Name of Scheme: BABHANGOAN GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2740 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jan-2024 Actual Date of Completion (Capex): 12-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 13/ 119.32 Babhangoan 26.315478 82.006882
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 570 LPM/ 50 M Babhangoan 26.315478 82.006882
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 14 M Babhangoan 26.315478 82.006882
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/ K7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/PN-6; CLASS PE-100 200 0.028
2 HDPE/PN-6; CLASS PE-100 180 0.052
3 HDPE/PN-6; CLASS PE-100 160 0.454
4 HDPE/PN-6; CLASS PE-100 140 0.409
5 HDPE/PN-6; CLASS PE-100 125 0.189
6 HDPE/PN-6; CLASS PE-100 110 0.268
7 HDPE/PN-6; CLASS PE-100 90 1.322
8 HDPE/PN-6; CLASS PE-100 75 0.716
9 HDPE/PN-6; CLASS PE-100 63 8.875
HSC Connection
Sno. Total Nos.
1 604
Other Details
2.48
0.00
2.53
12-Feb-2024
01-Dec-2024