| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20064741 | Name of Scheme: Raisa Gram Panchayat Water Supply Scheme | No. of Villages: 3 | No. of Habitation Covered: 7 |
| Total Population Covered: 2920 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 05-Jan-2025 | Actual Date of Completion (Capex): 01-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Plain Pipe (m) | 104 | TW | 26.031813 | 83.637679 |
| 2 | Strainer (m) | 24 | TW | 26.031813 | 83.637679 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump | 650/48 | PH | 26.031813 | 83.637679 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zinc Tank | 200/18 | OHT | 26.031816 | 83.637677 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN6 PE100 | 75 | 0.33 | |
| 2 | HDPE PN6 PE100 | 90 | 0.17 | |
| 3 | HDPE PN6 PE100 | 110 | 1.94 | |
| 4 | HDPE PN6 PE100 | 140 | 0.943 | |
| 5 | HDPE PN6 PE100 | 63 | 15.46 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 445 |