Scheme ID: 20064774 Name of Scheme: LOUHAR PASHCHIM GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 6860 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jul-2024 Actual Date of Completion (Capex): 17-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 35.01 M / 265.17 M Louhar paschim 26.235047 81.999798
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 460 LPM / 50 M Louhar paschim 26.235047 81.999798
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275 KL / 14 M Louhar paschim 26.235047 81.999798
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 100 0.017
2 DI / K7 125 0.500
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6: Class PE-100 63 12.94
2 HDPE / PN-6: Class PE-100 75 3.378
3 HDPE / PN-6: Class PE-100 90 0.607
4 HDPE / PN-6: Class PE-100 110 2.113
5 HDPE / PN-6: Class PE-100 125 0.372
6 HDPE / PN-6: Class PE-100 140 0.043
7 HDPE / PN-6: Class PE-100 160 0.081
8 HDPE / PN-6: Class PE-100 180 0.077
9 HDPE / PN-6: Class PE-100 200 0.584
HSC Connection
Sno. Total Nos.
1 961
Other Details
3.96
0.00
4.07
21-May-2025
01-Nov-2025