Project Completion Certificate (Ground Water)
Scheme ID: 20064800 Name of Scheme: Umrapur Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2110 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 07-Jan-2023 Actual Date of Completion (Capex): 23-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18 / 131.3 Umrapur 27.469795 80.717239
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 460 LPM / 45 Mtr. Umrapur 27.469795 80.717239
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL / 14 Mtr. Umrapur 27.469795 80.717239
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 63 3.544
2 HDPE Pipe 75 0.0496
3 HDPE Pipe 90 0.120
4 HDPE Pipe 110 1.908
5 HDPE Pipe 140 0.092
HSC Connection
Sno. Total Nos.
1 415
Other Details
1.71
0.00
1.71
21-Jul-2024
23-Nov-2024