| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20064896 | Name of Scheme: Dayalpur | No. of Villages: 3 | No. of Habitation Covered: 12 |
| Total Population Covered: 3094 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jul-2024 | Actual Date of Completion (Capex): 16-Mar-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well -150X200 | 21.08/73.91 | Dayalpur | 25.959576 | 82.38252 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump-15HP | 650/46.90 | Dayalpur | 25.959576 | 82.38252 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175KL-12M | Dayalpur | 25.959732 | 82.382549 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.0149 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 160 | 0.7375 | |
| 2 | HDPE PIPE PN-6 | 140 | 0.4438 | |
| 3 | HDPE PIPE PN-6 | 110 | 0.8915 | |
| 4 | HDPE PIPE PN-6 | 90 | 0.6064 | |
| 5 | HDPE PIPE PN-6 | 75 | 0.082 | |
| 6 | HDPE PIPE PN-6 | 63 | 10.8047 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 490 |