Project Completion Certificate (Ground Water)
Scheme ID: 20065049 Name of Scheme: ASAI No. of Villages: 3 No. of Habitation Covered: 7
Total Population Covered: 3311 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jan-2024 Actual Date of Completion (Capex): 03-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 15/64.54 ASAI 26.591216 80.080882
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 850/64 ASAI 26.591216 80.080882
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/16 ASAI 26.591216 80.080882
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.0124
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.079
2 HDPE 90 2.018
3 HDPE 110 0.615
4 HDPE 125 1.433
5 HDPE 140 1.418
6 HDPE 160 0.280
7 HDPE 180 1.439
HSC Connection
Sno. Total Nos.
1 667
Other Details
4.46
0.00
3.66
17-Apr-2024
18-Apr-2024