Project Completion Certificate (Ground Water)
Scheme ID: 20065069 Name of Scheme: BARAGAON BHIKKI No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3204 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jan-2024 Actual Date of Completion (Capex): 12-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 33.13/173.27 BARAGAON BHIKHHI 26.458653 79.822777
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 800/64 BARAGAON BHIKHHI 26.458653 79.822777
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/16 BARAGAON BHIKHHI 26.458653 79.822777
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.292
2 HDPE 90 2.384
3 HDPE 110 0.0305
4 HDPE 125 0.128
5 HDPE 160 2.107
HSC Connection
Sno. Total Nos.
1 701
Other Details
4.20
0.00
3.35
29-Mar-2024