Project Completion Certificate (Ground Water)
Scheme ID: 20065092 Name of Scheme: Bisoha No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3398 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jan-2024 Actual Date of Completion (Capex): 08-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.52/182.44 BISOHA 26.469162 79.786642
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 700/66 BISOHA 26.469162 79.786642
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/18 BISOHA 26.469162 79.786642
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.1370
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.610
2 HDPE 90 3.306
3 HDPE 110 1.286
4 HDPE 125 0.453
5 HDPE 160 0.450
HSC Connection
Sno. Total Nos.
1 623
Other Details
3.54
0.00
2.91
12-Nov-2023
13-Nov-2023