| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20065165 | Name of Scheme: KAPURIPUR Water Supply Scheme | No. of Villages: 2 | No. of Habitation Covered: 8 |
| Total Population Covered: 2387 | Base Year: 2022 | Intermediate Year: 2038 | Design Year: 2052 |
| Date of Completion (As per Contract): 17-Feb-2024 | Actual Date of Completion (Capex): 07-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 14.02 / 57.50 | Kapuripur | 81.57679379 | 26.41755616 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump | 500 LPM/ 54 M | kapuripur | 81.57679379 | 26.41755616 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 kl / 16 MTR | kapuripur | 81.57692924 | 26.41766513 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI- k7 | 100 | 0.236 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 | 63 | 6.36 | |
| 2 | HDPE PN-6 | 90 | 1.02 | |
| 3 | HDPE PN-6 | 110 | 1.62 | |
| 4 | HDPE PN-6 | 140 | 0.60 | |
| 5 | HDPE PN-6 | 160 | 0.4 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 484 |