Project Completion Certificate (Ground Water)
Scheme ID: 20065222 Name of Scheme: Paniyar Water Supply Scheme No. of Villages: 5 No. of Habitation Covered: 17
Total Population Covered: 4114 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 15-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 17.03/56.45 PANIYAR 29.044441 77.591579
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 860/52 PANIYAR 29.044441 77.591579
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/14 PANIYAR 29.044441 77.591579
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0176
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 22.349
2 HDPE 90 4.83
3 HDPE 110 1.196
4 HDPE 140 0.519
5 HDPE 180 0.76
6 HDPE 200 0.157
HSC Connection
Sno. Total Nos.
1 797
Other Details
4.55
0.00
4.52
15-Sep-2024
16-Dec-2024