| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20065234 | Name of Scheme: PARSAURA | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 1955 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 18-Jan-2024 | Actual Date of Completion (Capex): 22-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21/263.46 | PARSAURA | 26.745998 | 79.793089 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 500/64 | PARSAURA | 26.745998 | 79.793089 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/18 | PARSAURA | 26.745998 | 79.793089 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K7 | 100 | 0.007 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDP[E | 63 | 3.810 | |
| 2 | HDPE | 90 | 1.820 | |
| 3 | HDPE | 110 | 0.842 | |
| 4 | HDPE | 125 | 1.054 | |
| 5 | HDPE | 140 | 0.408 | |
| 6 | HDPE | 180 | 0.628 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 339 |