Project Completion Certificate (Ground Water)
Scheme ID: 20065630 Name of Scheme: Jamauli PWS No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 4544 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jan-2022 Actual Date of Completion (Capex): 06-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.242
2 HDPE 90 3.737
3 HDPE 110 1.362
4 HDPE 125 .425
5 HDPE 140 .704
HSC Connection
Sno. Total Nos.
Other Details
3.36
0.00
3.37
11-Feb-2024
12-Feb-2024