| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20065721 | Name of Scheme: BADAGAON WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 4132 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 09-Jan-2023 | Actual Date of Completion (Capex): 04-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 19 m/ 51.60 m | BADAGAON | 26.067749 | 81.803095 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 870 LPM / 56 M | BADAGAON | 26.067749 | 81.803095 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250KL / 18 M | BADAGAON | 26.067749 | 81.803095 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.0229 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.326 | |
| 2 | HDPE | 90 | 4.444 | |
| 3 | HDPE | 110 | 0.769 | |
| 4 | HDPE | 125 | 0.275 | |
| 5 | HDPE | 140 | 0.275 | |
| 6 | HDPE0.425 | 160 | 0.425 | |
| 7 | HDPE | 180 | 1.037 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 672 |