Project Completion Certificate (Ground Water)
Scheme ID: 20065731 Name of Scheme: SONARI KALAN & AMTAHI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 19
Total Population Covered: 7074 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 09-Jan-2024 Actual Date of Completion (Capex): 07-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 2 19 / 72.6 SONARI KALAN & AMTAHI 26.116131 81.926562
2 TUBEWELL 1 15 / 58.77 SONARI KALAN & AMTAHI 26.102636 81.9163921
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 750 LPM / 56 M SONARI KALAN & AMTAHI 26.102636 81.9163921
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 425 KL / 18 M SONARI KALAN & AMTAHI 26.102636 81.9163921
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.412
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 19.955
2 HDPE 90 5.841
3 HDPE 110 2.951
4 HDPE 140 2.286
5 HDPE 160 0.501
6 HDPE 180 0.544
HSC Connection
Sno. Total Nos.
1 1070
Other Details
7.59
0.00
7.57
07-Mar-2025
08-Jun-2025