| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20065948 | Name of Scheme: HUSAINGANJ KALAN WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 10 |
| Total Population Covered: 5775 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 15-Dec-2024 | Actual Date of Completion (Capex): 07-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150 MMØ PLAIN PIPE | 5.80 | HUSAINGANJ KALAN | 26.443252 | 81.663421 |
| 2 | 300 MMØ PLAIN PIPE | 49.00 | HUSAINGANJ KALAN | 26.443252 | 81.663421 |
| 3 | 150 MMØ SLOTTED PIPE | 06.00 | HUSAINGANJ KALAN | 26.443252 | 81.663421 |
| 4 | 300 MMØ SLOTTED PIPE | 21.00 | HUSAINGANJ KALAN | 26.443252 | 81.663421 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 960 LPM / 56 M | HUSAINGANJ KALAN | 26.443252 | 81.663421 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 275 KL / 18 M | HUSAINGANJ KALAN | 26.443252 | 81.663421 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.019 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 7.409 | |
| 2 | HDPE PIPE | 63 | 8.243 | |
| 3 | HDPE PIPE | 110 | 0.568 | |
| 4 | HDPE PIPE | 125 | 0.286 | |
| 5 | HDPE PIPE | 140 | 2.309 | |
| 6 | HDPE PIPE | 160 | 0.373 | |
| 7 | HDPE PIPE | 180 | 0.599 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 922 |