Project Completion Certificate (Ground Water)
Scheme ID: 20065956 Name of Scheme: IMLI GAON WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 5157 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Feb-2025 Actual Date of Completion (Capex): 20-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 31.80 IMLIGAON 26.436219 81.721343
2 150MM SLOTTED PIPE 24 IMLIGAON 26.436219 81.721343
3 200MM PLAIN PIPE 134 IMLIGAON 26.436219 81.721343
4 200MM SLOTTED PIPE 31 IMLIGAON 26.436219 81.721343
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 525LPM / 54MTR IMLIGAON 26.436219 81.721343
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 300KL / 16MTR IMLIGAON 26.436219 81.721343
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 .117
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 2.658
2 HDPE PIPE 63 9.857
3 HDPE PIPE 110 1.265
4 HDPE PIPE 125 .372
5 HDPE PIPE 140 .379
6 HDPE PIPE 160 .163
HSC Connection
Sno. Total Nos.
1 810
Other Details
4.44
0.00
4.34
12-Dec-2024
15-Mar-2025