| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20065961 | Name of Scheme: BISRA PURAB WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 13 |
| Total Population Covered: 3811 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 05-Aug-2024 | Actual Date of Completion (Capex): 10-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | MS PIPE (300MM) | 15 M/42.5 M | BISARA PURAB | 26.347746 | 81.790582 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 850 LPM/54 M | BISARA PURAB | 26.347746 | 81.790582 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225KL / 16M | BISARA PURAB | 26.347746 | 81.790582 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 0.0328 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE (63MM-160MM) | 160 | 17.342 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 795 |