Project Completion Certificate (Ground Water)
Scheme ID: 20066016 Name of Scheme: CHAK LODIPUR Water Supply Scheme No. of Villages: 4 No. of Habitation Covered: 5
Total Population Covered: 1820 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 20-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.009
2 HDPE 75 2.331
3 HDPE 63 3.878
4 HDPE 110 0.139
HSC Connection
Sno. Total Nos.
Other Details
1.68
0.00
1.63
28-Aug-2024
28-Sep-2024