| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066048 | Name of Scheme: BHAIE GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 11 |
| Total Population Covered: 11790 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 12-Jan-2024 | Actual Date of Completion (Capex): 12-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 43.02/308.59 M | Bhaie | 26.208892 | 82.011217 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump- 1 & 2 | 790 LPM/50 M | Bhaie | 26.208892 | 82.011217 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 450 KL/ 16 M | Bhaie | 26.208892 | 82.011217 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K9 | 150 | 1.667 | |
| 2 | DI / K9 | 125 | 0.018 | |
| 3 | DI / K9 | 250 | 0.301 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / PN-6:Class PE-100 | 63 | 24.853 | |
| 2 | HDPE / PN-6:Class PE-100 | 75 | 5.228 | |
| 3 | HDPE / PN-6:Class PE-100 | 90 | 3.713 | |
| 4 | HDPE / PN-6Class PE-100 | 110 | 1.162 | |
| 5 | HDPE / PN-6:Class PE-100 | 125 | 0.688 | |
| 6 | HDPE / PN-6:Class PE-100 | 140 | 0.903 | |
| 7 | HDPE / PN-6:Class PE-100 | 160 | 0.405 | |
| 8 | HDPE / PN-6:Class PE-100 | 200 | 0.199 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1523 |